Licensed 309A & Master Electrician · $5 million commercial liability insuranceECRA/ESA Licence #7018446Call (416) 854-3007

Renovation electrical work

Renovation and lighting electrical work that fits the whole project.

Good renovation wiring is planned before the walls close. Electrical Standard coordinates circuits, lighting, switching, appliance requirements and inspection stages with the finished layout in mind.

Common needs

Projects we can plan around

A useful electrical scope connects the drawings, equipment specifications and real conditions at the property.

  • Kitchen renovations and new appliance circuits
  • Basement finishing and secondary living spaces
  • Additions, altered layouts and open-concept renovations
  • Pot lights, decorative fixtures and layered lighting
  • Dedicated circuits for equipment and appliances
  • Receptacle, switch and lighting-control updates

What is included

From rough-in to finishing

The electrical work is sequenced with the renovation so locations, inspections and finishing details are not afterthoughts.

  • Load review and circuit planning
  • Device, fixture and switching layouts
  • Rough-in wiring and required boxes
  • Dedicated appliance and equipment circuits
  • Trim, testing and final fixture installation
  • ESA notification and inspection coordination when required

How it works

Clear steps.
No mystery handoffs.

01

Review the plan

Share drawings, appliance specifications, lighting ideas and the construction schedule.

02

Coordinate rough-in

Circuiting and device locations are confirmed before walls and ceilings are closed.

03

Finish and inspect

Devices and fixtures are installed, tested and coordinated through the required inspection stages.

Service questions

Useful answers
before you call.

When should the electrician get involved in a renovation?

Before demolition is complete and definitely before framing or cabinetry decisions become difficult to change. Early coordination helps identify panel capacity, dedicated-circuit needs and realistic fixture locations.

Can you work from drawings or coordinate with my contractor?

Yes. Electrical Standard can review drawings, equipment schedules and site conditions and coordinate the electrical sequence with the contractor and other trades.

Do lighting changes require an ESA notification?

It depends on the exact scope. New wiring and broader renovation work commonly require notification and inspection. The requirement is confirmed during scoping rather than left for the end of the project.

Request this service

Send useful details.
Get a useful answer.

Include the Toronto location, timing, clear photos and the symptom or scope. For a commercial emergency, call directly instead of waiting on email.

These buttons open your email or messaging app with the details filled in. Review the message, attach useful photos and press send.
Call nowText photosRequest quote