Send the essentials
Share the charger model, panel photos, service rating and the proposed parking location.

Level 2 EV charging
A charger is only one part of the installation. Electrical Standard reviews the available capacity, charging requirements and route from the panel before recommending a dedicated circuit, managed-load option or service upgrade.
Common needs
Useful EV quotes depend on the electrical service and physical route—not just the charger logo on the box.
What is included
The final design is based on the equipment instructions, Canadian approvals and the Ontario Electrical Safety Code.
How it works
Share the charger model, panel photos, service rating and the proposed parking location.
The electrical load and installation path are reviewed before a scope is recommended.
The circuit and charger are installed, tested and coordinated with ESA as required.
Service questions
Possibly. The answer depends on the calculated demand, existing electric loads, charger setting and available equipment options. Some properties can use a lower charging current or an approved energy-management system; others genuinely need more service capacity. The load review should decide—not guesswork.
Yes. ESA states that EV charger installations require an electrical notification before work starts. Electrical Standard coordinates the required notification and inspection as part of the agreed installation scope.
Send clear photos of the full panel, main service rating, panel directory, charger label, proposed mounting location and the route between them. Include an approximate distance and mention whether the garage is attached or detached.
Request this service
Include the Toronto location, timing, clear photos and the symptom or scope. For a commercial emergency, call directly instead of waiting on email.